DFM Analysis
Catch manufacturability issues early
2D & 3D Compare
Control change without slowing down
BOM Diagnostics
Detect shelf parts automatically
Design Visibility
Make designs accessible to everyone
Performance Insights
Measure what really matters
Good morning
+ New Review
13
Design Packages In Review
138
Drawings Approved (30 days)
Design Packages
| Package | Name | Type | Status | Files | Creator |
| DP-001042 | Turbine Housing Rev.C | ECR | In Progress | 4 | James Mitchell |
| DP-001041 | Gearbox Shaft Assembly | ECR | Approved | 2 | James Mitchell |
| DP-001040 | Intake Manifold V2 | ECR | Approved | 1 | David Chen |
| DP-001039 | Rotor Blade Fixture | ECR | In Progress | 6 | Sarah Williams |
| DP-001038 | Bearing Bracket Mount | ECR | In Progress | 10 | Sarah Williams |
Showing 5 of 16 packages
Recent Activity
| File | Ver | Time | Status | Created By |
| Propeller_Hub | 2 | 3 hours ago | Pre-Review | James Mitchell |
| Motor_Mount_Assy | 4 | 5 hours ago | Approved | David Chen |
| Frame_Plate_Rev.D | 9 | 1 day ago | 2D Review | Sarah Williams |
| Valve_Body_CNC | 3 | 2 days ago | Approved | James Mitchell |
| Exhaust_Manifold | 1 | 3 days ago | In Review | David Chen |
| Bracket_Assembly_V5 | 5 | 4 days ago | Approved | Sarah Williams |
Attention RequiredMark as read
DFM Analysis Complete
DFM analysis for Turbine_Housing has completed and is ready for review.
CommunicationMark as read
JM
James Mitchell mentioned you in Motor_Mount_Assy Rev.4
"Please approve this assembly @you"
DC
David Chen mentioned you in Frame_Plate_Rev.D
"@you this tolerance needs to be 0.05 mm"
SW
Sarah Williams mentioned you in Valve_Body_CNC Rev.3
"DFM flagged a thin wall issue @you can you check?"
Metrics
Engineering performance overview
ECOs Approved
7
+3 vs prev. month
Drawings Approved
26
+8 vs prev. month
ECOs In Process
10
same as prev.
Avg. ECO Cycle Time
15 days
+2d slower
Overdue Items
3
+1 vs prev. month
Critical
Turbine_Housing stuck 12 days waiting on approval. 2 drawings blocked behind it.
Warning
Avg ECO cycle time up to 15 days (+2d). James M. has 8 pending reviews.
Win
26 drawings approved this month. Highest in 6 months. First-pass rate at 87%.
Design Files by Status 69 total
Approval Throughput
Drawings & ECOs approved per week
W1W2W3W4W5W6W7W8
Time to Approval
Avg days from upload to approved
W1W2W3W4W5W6W7W8
Bottleneck Analysis
| Entity | Type | Step | Owner | Days | Status |
| Turbine_Housing | Drawing | Pending approval | David C. | 12 | Overdue |
| Gearbox_Shaft | Drawing | R&D review | James M. | 9 | Overdue |
| Intake_Manifold | Part | Under change | Sarah W. | 5 | 3 days |
| Rotor_Blade_Fixture | Drawing | Engineering review | James M. | 3 | Apr 10 |
Estimated Time Saved
87%
first-pass approval rate
First-Pass Approval Rate
David Chen92%
Kevin Park90%
James Mitchell88%
Brian Kim85%
Sarah Williams71%
Revision Depth
Revisions before approval
ECO Duration
Days to closure · Median: 12d
PDM Sync Health
Files synced today14
Sync errors (7d)2